Project Value: £4,500,000.00
Term: October 2021 – December 2022

The City of Edinburgh Council

The City of Edinburgh Council

May and Gunnet Court

This energy efficiency project involved the external and internal retrofit of two nine-storey blocks, comprising 96 mixed-tenure flats, to meet PAS 2035 standard. Delivered in North Edinburgh, the project aimed to enhance energy performance, improve resident comfort, and reduce carbon emissions.

Initially designed to upgrade the building envelope with external wall insulation and ceiling insulation around newly installed triple-glazed windows, the project evolved to achieve full PAS 2035 compliance. This included appointing key retrofit roles and collaborating closely with design teams, manufacturers, and the supply chain to integrate advanced energy-saving measures.

Working with partners, we developed a comprehensive retrofit design and ventilation strategy. Early cost modelling allowed for adjustments that secured additional ECO funding, optimising the scope to deliver enhanced value and client savings for the City of Edinburgh Council.

Protective scaffold design and erection
Installation of an innovative Soltherm 75 Silicone External Wall Insulation system
Strengthening the existing roof for insulated flat roof installation
An insulated warm deck
Liquid plastic for walkway floors
Rerouting rainwater systems
Replacing walkway balustrades with toughened glass, and installing FD60 entrance doors with side screens
Installation of ‘Secure by Design’ UPVC windows
Mechanical ventilation upgrades
Lightning protection renewal
A new fall arrest system & communal IRS system
Asbestos removal
Protective scaffold design and erection
Installation of an innovative Soltherm 75 Silicone External Wall Insulation system
Strengthening the existing roof for insulated flat roof installation
An insulated warm deck
Liquid plastic for walkway floors
Rerouting rainwater systems
Replacing walkway balustrades with toughened glass, and installing FD60 entrance doors with side screens
Installation of ‘Secure by Design’ UPVC windows
Mechanical ventilation upgrades
Lightning protection renewal
A new fall arrest system & communal IRS system
Asbestos removal
Cost: £4.5m
Timeframe: Oct 21 – Dec 22
Carbon Savings: 104,960 kgCO2/yr
19 Construction Support activities took place

THE CITY OF EDINBURGH COUNCIL

The Results

A bespoke Tenant Communication Strategy ensured 100% access and engagement throughout the project.

We addressed structural concerns by reinforcing the roof and refurbishing steel balconies, and leveraged innovative systems to maximise funding and optimise cost savings, delivering a sustainable, high-performance solution.