Roof replacements using Russell Grampian tiles
Remedial works to the existing substrate
Extracted and filled the cavity, followed by the application of a scrim-reinforced base coat with a polymer dash receiver and a dry/smooth aggregate finish, along with smooth render reveals
Gas safety checks were conducted before and after the works to ensure safety
Removal and replacement of all gutters and downpipes, with existing downpipes rerouted to run externally
Asbestos was identified, sampled, and removed in accordance with an asbestos survey report by a licensed subcontractor
New drainage runs were installed, connecting to existing sewage lines
Replaced grassed, paved, and tarmac paths
The project utilised the local supply chain, partnering with local organisations like ‘The Zone Initiative’ and ‘CVO East Ayrshire’ to offer residents services such as grass cutting, hedge trimming, and white goods uplift, ensuring a cleaner, tidier finish